Introduction

The aggregate crushing plant feeds the crusher through the feeder, crushes the material in the crusher, and then passes the conveyor belt to the vibrating screen to screen the finished product. In this production process, all the equipment together form the aggregate crushingg plsnt

Principle

The project uses two sections and one closed circuit process. They are: a section begins with a PE jaw crusher, PE-750×1050 for coarse breaking, the feeder feed port uses a vibrating screen to connect the feeder to meet the feed particle size standard, and the second section uses stone crushing equipment. The closed circuit section uses two circular vibrating screens to complete the circuit. The finished yarn of the discharged material can have a particle size of 0-5 mm, and a suitable particle size can be selected between 15-25 mm.

Installation and maintenance of aggregate crushing plant
Installation test:
1. The stone production line equipment should be installed on a horizontal concrete foundation and fixed with anchor bolts.
2. When installing, pay attention to the vertical direction of the main body and the horizontal.
3. After installation, check whether the bolts in all parts are loose and the main door is tight. If so, tighten it.
4. Configure the power cord and control switch according to the power of the stone production line equipment.
5. After the inspection is completed, the empty load test is carried out, and the test can be carried out normally.


  Maintenance points:
1. The shaft bears the full load of the negative machine, so good lubrication has a great relationship with the bearing life. It directly affects the service life and operation rate of the machine. Therefore, the injected lubricating oil is required to be clean and sealed well.
2. Pay attention to whether the work of each part of the machine in the stone production line is normal.
3, pay attention to check the wear level of the wear parts, pay attention to replace the worn parts,
4, the bearing oil temperature rises, should stop immediately to check the reasons to eliminate,
5. If there is impact sound when the rotating gear is running, it should be stopped and checked immediately and eliminated.

Relate:jaw crusher,impact crusher,Spring Cone Crusher,Symons cone crusher,Hydraulic cone crusher,Hammer crusher,Stone Crushing Plant,VSI crusher,Bucket wheel sand washer,Spiral sand washer,Sand washer,Mobile Jaw Crusher,Mobile Impact Crusher,Mobile Cone Crusher,Mobile VSI Crusher,GZD vibrating feeder,ZSW vibrating feeder,Belt conveyor,Circular vibrating screen,Flotation cell,Hydrocyclone,ironore line,chromeore line,copperore line,manganeseore line,coal line,platinum line,nickel line,leadandzinc line,Phosphateclay line,Tantaliteore line,concrete line,Aluminosilicate line,basalt line,ballast line,constructionwaste line,ore line,quartz line,quartz line,gypsum line,Aluminioore line,barite line,graphite line,copperandcobal line,cement line,calciumecarbonate line,talc line,Kaolin line,glass line,Bentonite line,Silica line,Potassiumsalt line,magnesium line,sulfur line,Ceramic line,riversand line,crush line,grind line,andesite line,mineralmining line,andesitmining

Send Enquiry

write down your requirement and contact details in the following form to get the latest price of this product within one day!

30 seconds for connecting online customer service

within 24 hours for getting email reply

factory-direct sale, 100% factory price

Top